Large Underwater Swimming Pool Window

ATL have just completed the design, supply and installation of a floor to ceiling underwater swimming pool window to a prestigious basement development in London.

The acrylic window which had to be craned over a listed building, down through three floors and then transported upright into the swimming pool measured 3.5m x 3.0m x 140mm and weighed in the order of 1700kg. The panel was specially commissioned and manufactured in Europe in 13 weeks and shipped by road to ATL’s factory for final inspection and edge preparation following which it was transported to site, lifted into position, installed and sealed in just 4 days.
 

Prepared to lift

Prepared to lift

Lift into Place

Lift into Place

Landing in the Pool

Landing in the Pool

 
Throughout the project ATL’s design and project management team worked with the architect, structural engineer and main contractor to resolve a specification, design and method that satisfied both the client and the difficulties of accessing the pool in such a restricted location.

Ready for sealing

Ready for sealing

The completed installation

The completed installation

Trial Fill

Trial Fill

The final result is a unique and stunning feature that we’re sure will be admired and envied for years to come.